项目

北门线轻铁, Seattle, 华盛顿

Quickening commutes around the University of 华盛顿

北门线轻铁

北门线路扩展项目是4.3 mile extension of the Link light rail system from the University of 华盛顿 Station near Husky Stadium to just south of the Northgate mall. It consists of a double track configuration with approximately 3.2 miles in twin-bored tunnels with two cut and cover stations serving the University District (U-District Station) and the Roosevelt neighborhoods (Roosevelt Station).

与声传结合, 正规博彩十大网站排名 is providing day to day contract administration for all the NLINK construction contracts, 包括整体项目管理, resident engineering and the full range of construction management services for the tunnels and stations civil works contracts.

  • 3.2

    长达数英里的双隧道

  • 3

    新车站

  • 10

    单独的建筑合同

  • 23

    使用扫描电镜技术的交叉通道

“We are currently in year seven of the program and remain ahead of schedule and under budget. There were significant challenges in the mining due to the aggressive and highly variable nature of the ground conditions. These were successfully overcome through a series of innovative technical solutions which can now become part of our "tool box" for future projects.”

保罗Gasson

项目经理,雅各布斯

北门链接

北门链接 Extension Project will connect Sound Transit’s University Link light rail segment to the Northgate business/retail center in Seattle, 华盛顿.

The project will complete a system connecting three major urban centers to University Link and Central Link (which extend from University of 华盛顿 through downtown Seattle to SeaTac airport). 它包含4个.3英里(6.9公里)双轨轻轨.2英里(5.6 kilometers) of which will be in twin bored soft-ground tunnels, and 0.6英里(0.9 kilometers) of which will be in retained cuts fills and elevated structures.

The project includes two underground transit stations (U District and Roosevelt), 一个高架车站(北门), 一个入口结构和23个交叉通道.